Thursday, May 31, 2018

The A Street transition mat was installed

Just a heads up for anyone that uses the A Street beach that needs the transition mat to safely access it, the DPW installed it Tuesday.

A lot of the sand that was piled up on both sides of the area where the mat lies that made it difficult to walk on and more difficult maneuver anything on wheels on were also taken down and the area was smoothed out.

Wishing everyone  a safe and happy summer :-)




No comments:

Post a Comment

Note: Only a member of this blog may post a comment.